
Solar farm land in Gloucestershire.
Gloucestershire runs from the Cotswolds to the Severn Vale and the Forest of Dean. Its councils are changing, and its landscapes and flood plains shape where solar can go. Here's what matters locally.
What matters for solar in Gloucestershire.
Councils are changing
The government has decided that one new council will replace the county and district councils on 1 April 2028. Until then, your district council is the local planning authority.
The Cotswolds come first
The Cotswolds National Landscape Board does not, in principle, support solar farms larger than five hectares inside the National Landscape. Sites outside it are far easier to consent.
Mapped for renewables
Cotswold District Council's Renewable Energy Study (2025) is evidence for its Local Plan review, and looks at where solar and wind could fit.
Watch the Severn Vale
Land along the Severn and its tributaries can flood, as the 2007 floods around Tewkesbury and Gloucester showed. Higher, drier land is usually a better fit for solar.
Who decides in Gloucestershire.
Most solar farms in Gloucestershire are decided by the district, borough or city council where the land sits. South Gloucestershire has its own unitary council. Solar farms up to 100MW are decided by the local planning authority. Larger schemes go through the national planning process, after the threshold rose from 50MW on 31 December 2025.
Planning authorities
- Cotswold, Forest of Dean and Stroud district councils
- Cheltenham and Tewkesbury borough councils, and Gloucester City Council
- South Gloucestershire Council (a separate unitary council)
Protected landscapes
- Cotswolds National Landscape
- Wye Valley National Landscape (shared with Herefordshire and Monmouthshire)
- Malvern Hills National Landscape (shared with Herefordshire and Worcestershire)
A single new Gloucestershire council takes over on 1 April 2028, with shadow elections on 6 May 2027. Gloucestershire County Council does not decide solar farm applications.
Grid access in Gloucestershire.
Most of Gloucestershire is served by National Grid Electricity Distribution (NGED). Capacity differs from one substation to the next, so where your land connects matters.
Grid connections reform has reshaped the queue. In December 2025, NGED confirmed reformed queue positions across its areas, with around 9.8GW of solar still in the queue. Projects with land secured and planning moving now get priority.
That is why we check the grid first, for free, before you sign anything. How grid reform affects landowners →
A steady rent, at no cost to you.
Every site is different. We give you a clear figure once we know your land. How solar rents work →
Rent
Solar rents are often around £1,000 per acre a year, linked to inflation, for the life of the lease.
Lease length
Most new solar leases run for around 30 to 40 years. At the end, the land is restored.
No cost to you
The project pays for surveys, grid and planning.
Keep farming
Sheep can graze between the panels, and the land can be managed for wildlife.
Solar in Gloucestershire: questions
Who decides a solar farm planning application in Gloucestershire?
Usually the district, borough or city council where the land is, such as Cotswold, Stroud or Tewkesbury, until the new single council takes over in April 2028. South Gloucestershire Council decides in its area. Schemes over 100MW go through the national process instead.
Can I put a solar farm in the Cotswolds National Landscape?
It is much harder. The Cotswolds National Landscape Board does not, in principle, support solar farms over five hectares inside it, so most solar farms are on land outside it. We check this first.
How much do solar farms pay per acre in Gloucestershire?
Solar rents are often around £1,000 per acre a year, linked to inflation, but the figure depends on the grid connection, the site and the market. We give you a clear figure once we know your land.
Is there grid capacity for solar in Gloucestershire?
It depends on your nearest substation and the queue ahead of it. A free grid check is the quickest way to find out.
Other counties
- Land for solar in Devon →
- Land for solar in Cornwall →
- Land for solar in Somerset →
- Land for solar in Dorset →
- Land for solar in Wiltshire →
- Landowner guide →
Sources: Gloucester City Council: reorganisation decision · Cotswolds National Landscape: renewable energy · Cotswold District Council: Renewable Energy Study · Malvern Hills National Landscape · Discovering Britain: Tewkesbury floods · NGED: queue formation. Checked 25 October 2026.
Got land in Gloucestershire? Check it for free.
Tell us where it is. We'll check the grid and planning picture and give you an honest answer.