Utility-scale solar, taken to ready-to-build.
Hands-on development support for solar, battery and wind projects across the UK. From the first site search to a fundable, ready-to-build project.
Every stage, from field to RTB.
Use us for the whole journey or just the stage you need.
Site screening
We find and test land quickly, so you only spend money on sites with a real chance.
Landowner terms
We open the conversation, agree heads of terms and keep landowners informed and on side.
Grid applications
We prepare and manage grid applications with the network operator, including NGED across the South West.
Planning
Our in-house Chartered Town Planner (MRTPI) runs the application and coordinates the surveys and reports.
Ready-to-build
We bring grid, land and planning together into a clean, investable RTB package.
Solar, battery storage and wind.
The same process for each: find the land, secure the grid, win planning, reach ready-to-build.

Solar farms
Ground-mounted solar from 5MW to 49.9MW. Land close to the grid, designed around hedges, views and grazing so it stands the best chance in planning.

Battery storage
Standalone battery sites, or batteries added to solar. A small footprint, but grid capacity, access and noise all need checking early.

Onshore wind
Onshore wind sites, from early wind and landscape checks through grid and planning. Talk to us about your site.
Screen. Secure. Deliver.
Screen
A shortlist of sites that work on grid, planning and land. Weak sites are dropped early.
Secure
Landowner terms agreed and grid applications in. The site is yours to progress.
Deliver
Planning, surveys and consultants coordinated until the site is ready to build.
One team, from field to first power and beyond.
Take us for one stage or the whole life of the project. Build and maintenance are delivered with trusted partners.
Find
Site screening and landowner terms.
Consent
Grid connection and planning.
Ready-to-build
A clean, fundable RTB package.
Build
EPC construction, managed through to energisation.
With partnersOperate
Operations, maintenance and performance monitoring.
With partners
Faster decisions, fewer dead ends.
We use our own software on every project. It means faster site finding, grid and planning checks on every site, and paperwork drafted for you.
Need it built? See EPC and construction →
See our planning consultancy →
Are you a landowner? Read our guide →
Guides: what ready-to-build means · solar farm cost per MW · how long a solar farm takes
Frequently asked questions
What does ready-to-build (RTB) mean for a solar farm?
A solar farm is ready-to-build when it has land rights, a grid connection offer and planning consent in place. At that point it can be funded and construction can start.
How long does it take to get a solar farm to ready-to-build?
With good screening, a site can often reach ready-to-build in around 18 months, though the grid connection and planning can stretch that. Taking a solar farm all the way to built and generating usually takes two to four years.
Who handles grid connections for solar farms?
It depends where the site is. Each area has its own network operator: in the South West, Midlands and Wales it is National Grid Electricity Distribution (NGED). We prepare the application, manage the process and keep track of the offer and its milestones.
Do you work on sites outside the South West?
Yes. We're based in Exeter and know the South West grid, planners and landowners well, and we take on sites anywhere in the UK. Our software works UK-wide too.
Can you take on just one stage, like grid or landowner terms?
Yes. We can run a whole project to RTB or support you on a single stage, such as screening, landowner negotiations or the grid application.
Got a site or a pipeline to progress?
Tell us where you are and we'll tell you how we can help.