Could your land host a solar farm? Find out in seconds.
Draw your field on the map. We read the planning data, the grid and your council’s record while you wait, and the answer appears right here on this page. Not in a few days, not after a call: now.
The only UK solar land check that answers instantly, on the page.
Read live from the government’s planning data, the network operators’ published capacity and DESNZ’s register of decided schemes.
Find your field, and we’ll read the data on it.
- Planning constraints on the field
- Spare grid capacity, and a line to tee into
- What a 30-year lease could pay
- How your council has decided on solar
Reading the data on your field.
Finding your land…
We couldn’t finish the instant check for this field.
That happens when the planning data for an area is slow to answer. It does not mean your land is unsuitable. We have your details and will run the check by hand and email you the result, usually within a few working days. You can also try again now: a second go is usually quicker.
Thank you. Here’s what happens next.
We check it by hand
Within a few working days
We look at the grid near you, the nearest substation and the planning constraints properly, the way we would for one of our own sites.
An honest answer
A call, if you want one
In plain English. If your land is not right for solar, we say so and explain why, and you will not hear from us again unless you ask.
Heads of terms
3 to 6 months
If it works, clear terms for you and your solicitor. Surveys, grid and planning are paid for by the project, not by you.
While you wait: how much do solar farms pay per acre?
Three questions, answered from public data.
The same screen we run on our own sites, pointed at your field. Nothing is guessed: every line of the answer names where it came from and the date it was published.
- Screen
What is on the land.
National Parks and National Landscapes, flood risk, farmland grade, wildlife sites, ancient woodland and heritage, read from the government’s own planning data for the field you draw.
From Natural England, the Environment Agency, Historic England and DEFRA, via the national planning data platform.
- Connect
Where the power could land.
The nearest substation with published spare capacity: how far, how much, and the date the operator published it. How much of your field that capacity would take, and the nearest 33 kV or 132 kV line you could tee into instead.
From The network operators’ own published capacity maps.
- Worth
What it could pay.
An indicative rent range over a 30-year lease on the acres that could connect today, not just the whole field, and how many solar farms your council has approved since 2015.
From Our own heads of terms and agent quotes for the rent; DESNZ’s register of decided schemes for the council record.
What it cannot tell you
- It checks the area you drew, not who owns it, the access to it, or how it sits in the view.
- Spare capacity is what the operator has published. It can be taken by someone else, or withdrawn, before an application is made.
- The rent range is a market figure from our own heads of terms, not an offer. A site that would be difficult gets no figure at all.
- Ecology, landscape and glint surveys, and the council’s view of this particular field, come later and by hand.
What makes land suitable for a solar farm?
Six things decide it, and the grid matters most. Other developers scatter their minimums across their sites; here they are in one place. The check reads all six for the field you draw.
Size
From about 20 acres
A solar farm needs roughly 4 to 5 acres for each megawatt. Around 20 acres can be enough; most developers look for more, and land too small for solar can still suit a battery site.
How much land a solar farm needs →Grid
Near a substation or a 33 kV line
The biggest factor by far. Land within a few miles of a substation with spare capacity, or under or beside a 33 kV or 132 kV line, is worth far more to a developer than land that is not.
Why the grid sets the pace →Farmland grade
Grade 3b, 4 or 5 is easiest
Planning policy steers solar away from the best and most versatile land (grades 1, 2 and 3a). Lower-grade land is not a bar to a good field; high-grade land makes planning harder.
The land grade survey →Designations
Outside a National Park or National Landscape
A National Park, a National Landscape (AONB), a Site of Special Scientific Interest or ancient woodland on the field usually stops a scheme. Being near a listed building or a scheduled monument matters too.
The landowner guide →Flood risk
Not flood zone 3
Land in the highest flood band is usually avoided. The lowest band is clear; the middle band can work with design.
Pros and cons for landowners →Lie of the land
Flat or gently south-facing
Steep or north-facing fields make less power and cost more to build on. A road a lorry can use during the build helps.
Farming between the rows →
Land that falls short for solar can still suit battery storage(2 to 5 acres near a substation) or a single wind turbine. The check says so where it applies.
Around £1,000 to £1,200 an acre a year.
That is the typical UK solar farm rent today: linked to inflation, on a lease of 30 to 40 years, with the panels removed and the land restored at the end. Land with a strong grid connection earns more. Grazing between the rows usually carries on.
The check gives you a range for your own field, on the acres that could connect today. A site that would be difficult gets no number, by design.
How solar farm rent works, in full →From a field on a map to clear terms.
In seconds
The answer, on this page
Constraints, grid, your council’s record and a rent range, read from public data for the field you drew. A copy goes to your email.
Within a few working days
We check it by hand
We look at the grid near you, the nearest substation and the planning constraints properly, the way we would for one of our own sites.
A call, if you want one
An honest answer
In plain English. If your land is not right for solar, we say so and explain why, and you will not hear from us again unless you ask.
3 to 6 months
Heads of terms
If it works, clear terms for you and your solicitor. Surveys, grid and planning are paid for by the project, not by you.
From first look to switch-on usually takes 2 to 5 years, and the grid connection date sets the pace.How long a solar farm takes →
Solar land check questions
How quickly do I get the answer?
In seconds. Draw your field, say where to send your copy, and the result appears on this page while you watch: the planning data, the grid nearby and your council’s record are read live for the field you drew. No other UK solar land check answers on the page; the rest take your details and reply in days.
Is my land suitable for a solar farm?
It depends on four things: how close it is to a substation or a 33 kV line with spare capacity, whether it sits in a protected landscape or a flood zone, its farmland grade, and its size and shape. The free check reads all four from public data for the field you draw and gives you a plain answer in about a minute.
How many acres do you need for a solar farm?
Roughly 4 to 5 acres for each megawatt. Around 20 acres can be enough for a small scheme, and a 50MW solar farm needs 200 to 250 acres. Land that is too small for solar can still suit a battery storage site, which needs 2 to 5 acres.
How much do solar farms pay per acre?
Solar farm rents in the UK are typically around £1,000 to £1,200 per acre a year, linked to inflation, on leases of 30 to 40 years. Land with a strong grid connection can earn more. The check gives you an indicative range for your own field, on the acres that could connect today.
Can a solar farm go on grade 3 agricultural land?
Grade 3b, yes: it is the land most solar farms are built on. Grades 1, 2 and 3a are the best and most versatile land, and planning policy steers solar away from it, so a high-grade field makes planning harder but not impossible. A soil survey confirms the grade.
Can you build a solar farm in a National Park, a National Landscape or flood zone 3?
Usually not. A National Park, a National Landscape (the new name for an AONB) or a Site of Special Scientific Interest on the field almost always stops a scheme, and the highest flood band is avoided. Land next to a designation, rather than inside one, can still work.
How close to a substation does my land need to be?
The nearer the better, and it matters more than size. Land within a few miles of a substation with spare capacity, or beside a 33 kV or 132 kV overhead line it could tee into, is what developers look for. The check names the nearest substation with published capacity and how far it is.
Does my council approve solar farms?
Every council has a record, and the check reads it: how many solar farms your council has decided since 2015 and how many it approved, from the government’s register of planning decisions. It is the best early sign of how a scheme on your land would be received.
What does the land check actually read?
The government’s own planning data for the field you draw (designations, flood risk, farmland grade, wildlife, woodland and heritage), the network operators’ published spare capacity, DESNZ’s register of decided solar schemes, and our own heads of terms for the rent range. Every line of the answer says where it came from.
Is the land check really free, and will someone ring me?
Yes, and no. The check is free with no obligation, the answer appears on this page, and nobody rings you first. We email you a copy and keep your details so we can talk it through if you want to. We never pass them to anyone else.
How accurate is an instant check?
It is an early, automatic view from public data, the same screen we run before we look at one of our own sites. It is not a survey and not an offer. Every site we take further is checked by hand, and a difficult site is told it is difficult rather than given a number.
What if my land is not suitable?
The check says so, and why. That is useful to know before anyone offers you an option agreement. Some land that fails for solar suits battery storage or a single wind turbine, and we will say if yours might.
What happens after the check?
If it looks promising, we check the land by hand within a few working days and offer a call. If it works, we set out heads of terms for you and your solicitor. Surveys, grid applications and planning are paid for by the project. From first look to switch-on usually takes 2 to 5 years, and the grid connection date sets the pace.
It takes about a minute, and it costs nothing.
You get the same answer we would work out for ourselves before we looked at a site. If it reads badly, that is useful too: you will know, and you will not hear from us again unless you ask.
Check my land