Glossary

The jargon, in plain English.

Solar, battery, grid and planning terms explained in a sentence or two. If we use a word you don't know, it should be here.

A

ALCAgricultural Land Classification
A grading of farmland from 1 (excellent) to 5 (very poor). A soil survey confirms the grade on a site. More →
Ancillary services
Services that help the grid stay stable, such as fast frequency response. Batteries can be paid to provide them. More →

B

BESSBattery energy storage system
A set of batteries, usually in containers, that stores electricity and releases it later. More →
BMV landBest and most versatile
Farmland graded 1, 2 or 3a. Planning policy steers solar towards lower grades where possible. More →
BNGBiodiversity net gain
A legal requirement in England for most new development to leave nature at least 10% better than before. More →

C

Capacity Market
A government scheme that pays sites to be available to generate, or reduce demand, when the grid is tight. More →
CfDContract for Difference
A government-backed contract that gives a renewable project a fixed price for its power for a set number of years.
Co-location
Putting two technologies on one site, such as solar and batteries, so they can share a grid connection.
Connection offer
The network operator’s formal offer to connect a site to the grid, with a date, a cost and conditions. More →

D

DNODistribution network operator
The company that runs the local electricity network in your area. In the South West, that is NGED. More →

E

EIAEnvironmental Impact Assessment
A detailed study of a project’s effects on the environment. Only needed for some larger or sensitive schemes.
EPC (build)Engineering, procurement and construction
The contract to design, buy the kit for and build a project. Not to be confused with an Energy Performance Certificate.
Export limit
A cap on how much power a site can send to the grid, often set when the local network is busy. More →

G

G98 and G99
The rules for connecting generation to the grid. G98 covers small systems. G99 covers larger ones and needs approval before connection. More →
Gate 2
The stage in the reformed grid queue where projects that meet the readiness tests get a firm place and date. More →
Glint and glare
Reflections from solar panels. An assessment checks they won’t affect drivers, homes, trains or aircraft. More →
Grid supply point
Where the national transmission network feeds the local distribution network. Its capacity affects every site below it.

H

Half-hourly data
A record of how much electricity a site uses in every half hour. It is the best starting point for sizing solar. More →
Heads of terms
A short summary of the main points of a deal, agreed before the full legal documents are drafted. More →

I

Inverter
The box that turns the direct current (DC) from solar panels or batteries into the alternating current (AC) the grid uses.

K

kW, kWp and MW
Units of power. kWp is a solar system’s peak output. 1,000kW is 1MW.
kWh and MWh
Units of energy: power used or made over time. Your bill is priced per kWh.

L

LPALocal planning authority
The council, or national park authority, that decides planning applications in an area. More →
LVIALandscape and visual impact assessment
A study of how a project will change the landscape and views from homes, roads and footpaths. More →

M

MCS
A certification scheme for small renewable systems up to 50kW. Larger systems are not covered by it. More →
Microgrid
A local energy system, with its own generation and often storage, that can run with the grid or on its own. More →
MRTPI
Member of the Royal Town Planning Institute: a Chartered Town Planner. More →

N

NESONational Energy System Operator
The public body that balances the electricity system in Great Britain and runs connections reform.
NGEDNational Grid Electricity Distribution
The DNO for the South West, Wales and the Midlands.
NSIPNationally significant infrastructure project
A very large project decided by the government, not the local planning authority. For solar in England, that means over 100MW. More →

O

O&MOperations and maintenance
Looking after a site once it is running: monitoring, repairs, cleaning and grass or grazing management.
Option agreement
An agreement giving a developer the right to take a lease later, once grid and planning are in place. More →

P

Permitted development
Building work allowed without a full planning application, within set limits. Many rooftop systems qualify. More →
PPAPower purchase agreement
A long-term contract to buy power at an agreed price. With a solar PPA, a funder pays for the system. More →
Pre-application advice
Early, informal advice from the local planning authority on a proposal before a full application goes in. More →
Prior approval
A light-touch check by the local planning authority on some permitted development, such as design or glare, before work starts. More →
Private wire
A direct cable from a generator, such as a solar farm, to a nearby user, without going through the public grid. More →

R

RTBReady-to-build
A site with land rights, a grid connection offer and planning consent, ready to fund and build. More →

S

Securities
Money, or a guarantee, a developer may have to put up to hold a grid connection while it is built.
SEGSmart Export Guarantee
The scheme that makes larger energy suppliers pay you for electricity you export to the grid. More →
Substation
Where the grid changes voltage and lines meet. Being close to one with spare capacity is key for a solar or battery site.

T

TIATransmission impact assessment
A check on whether a project affects the national transmission network. Most projects under 5MW no longer need one. More →

V

VPPVirtual power plant
Many small energy assets, such as batteries and solar, controlled together so they act like one power station. More →

Y

Yield
How much electricity a solar system makes in a year, often given in kWh per kWp. More →

Still not sure what something means?

Ask us. We'll explain it in plain English, with no obligation.