Solar for factories and warehouses.
Big roofs and machines that run through the day make factories and warehouses some of the best sites for solar. Here is what makes it work, and what to check first.
Why solar suits factories and warehouses.
You use power while the sun is up
Machinery, compressed air, lighting and chargers run through the working day. Solar you use on site saves the full grid price, while exported power earns only a few pence.
Large, open roofs
Industrial roofs are big and usually free of shade. The Carbon Trust says the large roofs of warehouses are often well suited to solar.
Forklifts and electric vans
Electric forklifts and vehicle chargers add daytime demand. The Carbon Trust points to the fit between solar, forklift and vehicle charging, and battery storage.
Shifts and weekend working
Sites that work six or seven days a week lose fewer sunny days to empty buildings. The more days you work, the more of the solar you use yourself.
What the numbers could look like.
A factory with a 2,500 m² east-west roof, using 600,000 kWh a year on shifts, worked out with our solar calculator. Indicative only: a survey confirms the real figures.
- System size
- 375 kWp · 781 panels
- Power each year
- 337,392 kWh
- Solar used on site
- 64%
- Saving in year one
- £60,400
- Cost ex VAT
- £290,000 to £371,000
- Payback
- 4.8 to 6.1 years
What we check first.
We handle planning and the grid connection in-house. Installs are delivered with certified partner installers.
Roof strength
Many steel-framed warehouse roofs were built with little spare capacity. A structural engineer must confirm the roof can carry the panels and the extra wind load.
Fragile and asbestos roofs
The HSE says all roofs should be treated as fragile until a competent person confirms they are not. Older fibre cement sheets may contain asbestos, and rooflights are a particular hazard, so a survey comes first.
Fire safety and your insurer
RC62, the fire safety guidance insurers use, says panels should go on non-combustible roofs and not run across fire walls. It also says to discuss the project with your insurer before you start.
Grid connection and export limits
Every system this size needs G99 approval from the network operator before it connects. On a busy local network you may get an export limit, which affects how big the system should be.
Solar for factories and warehouses: questions
Are solar panels worth it for a factory?
Usually, if you use a lot of power in the day. Payback depends most on how much of the solar you use on site, because that saves the full grid price. We size the system from your half-hourly data, so little is wasted.
Can solar panels go on a warehouse roof?
Most metal-clad warehouse roofs can take solar, if the structure has enough spare capacity. Fragile or asbestos cement roofs need a survey first, and may need over-cladding or a new roof before panels go on.
Do I need planning permission for industrial solar panels?
In England, most rooftop solar on industrial buildings is permitted development, within limits. Since December 2023 there is no 1MW cap, but systems over 1MW need prior approval from the council. Listed buildings, and sites in Wales and Scotland, follow different rules.
Can I put solar on a building I lease?
Yes, with your landlord’s consent. Check your lease runs long enough to get your money back, as panels last 25 years or more. A solar PPA usually needs a long lease too, so talk to your landlord early.
Other businesses
- Cold stores and food businesses →
- Hotels and leisure →
- Schools and colleges →
- Farms and estates →
- Solar on farm buildings →
- Solar with no upfront cost →
Sources: RISCAuthority and FPA: RC62 fire safety with PV panel installations (2023) · HSE: roof work · Carbon Trust: warehousing and logistics guide (2019) · Planning Portal: December 2023 changes to solar permitted development. Checked 25 October 2026.
See what solar could do for your site.
Draw your roof and add your electricity use. Your estimate takes seconds.