Solar planning consultant in Lincolnshire.
Planning for solar farms and battery storage across Lincolnshire, led by our in-house Chartered Town Planner (MRTPI). More solar sits in the planning system here than anywhere else in Britain, and the arguments are different from most counties.
Planning that knows Lincolnshire.
Farmland grade decides most Lincolnshire cases
Objections here turn on the loss of best and most versatile arable land far more often than on landscape. An application that deals with soil grade honestly and early is in a much stronger position than one that does not.
Know which authority decides before you apply
Up to 100MW your district council decides. Above it the scheme goes to central government instead, which is a different process, a different timetable and a different evidence base. Getting this wrong is expensive.
Three districts share one plan
Lincoln, North Kesteven and West Lindsey are covered by the Central Lincolnshire Local Plan, adopted in 2023. The other districts have their own. We plan to the right policy from day one.
Grid and planning together
Lincolnshire is split between two distribution network operators, and a consent is only worth having with a connection. We check both at once, so nothing is wasted.
We work UK-wide
We are based in Exeter, not Lincolnshire, and we say so. Planning work is done on the papers and at the council that matters, and we travel for site visits and hearings.
Planning authorities in Lincolnshire.
Below 100MW, a Lincolnshire solar farm is decided by the district council where the land sits. Above it, the scheme goes to central government instead, which is how most of the county's very large projects have been consented. Solar farms up to 100MW are decided by the local planning authority. Larger schemes go through the national planning process, after the threshold rose from 50MW on 31 December 2025.
Planning authorities
- Boston Borough, East Lindsey, North Kesteven, South Holland, South Kesteven and West Lindsey district councils, and City of Lincoln Council
- North Lincolnshire Council and North East Lincolnshire Council (separate unitary authorities)
- The Planning Inspectorate and the Secretary of State for schemes over 100MW
Protected landscapes
- Lincolnshire Wolds National Landscape (around 560 square kilometres, designated 1973)
- Extensive Grade 1 and Grade 2 agricultural land across the fens and the south of the county
- Large areas of flood zone 3 in the fens, which affects layout and access rather than ruling a site out
Lincoln, North Kesteven and West Lindsey share one development plan, the Central Lincolnshire Local Plan, adopted in 2023. Proposals to reorganise Lincolnshire local government into unitary councils are under consideration, which may change who decides in future.
Know the cost up front.
The same fees across Lincolnshire and the UK. Surveys at cost plus a management fee.
- Desktop feasibility study: solar, wind or battery
- From £650 ex VAT
- Pre-application package
- From £3,000 ex VAT
- Full planning application, up to 10MW
- Price on request
- Full planning application, 10MW to 49.9MW
- Price on request
Solar planning in Lincolnshire: questions
Who decides a solar farm planning application in Lincolnshire?
Up to 100MW, the district council where the land is: West Lindsey, East Lindsey, North Kesteven, South Kesteven, South Holland, Boston Borough or the City of Lincoln, or one of the two northern unitary councils. Above 100MW the Secretary of State decides instead, which is how most of the county’s very large schemes have been consented.
Will good farmland stop my application?
Not on its own, but in Lincolnshire it is the issue most likely to attract objection. Policy expects poorer land to be used in preference to the best and most versatile grades. The application needs to show the land grade honestly, explain why the site was chosen, and set out what returns to agriculture at the end.
How long does solar planning take in Lincolnshire?
Local planning authorities aim to decide major applications, which include most solar farms, within 13 weeks, or 16 weeks if an Environmental Impact Assessment is needed. Surveys and pre-application advice come first. We give you a realistic timeline for your site.
Do you handle battery storage planning in Lincolnshire?
Yes, on its own or alongside solar. Battery storage is decided by the local planning authority whatever its size, so a large battery does not push a scheme into the national process.
What does a solar planning consultant cost?
Most of our fees are published. A pre-application package starts from £3,000 ex VAT. Full applications are priced for each site, so contact us for a quote. Specialist surveys are charged at cost plus a management fee.
Related
- Solar planning in Devon →
- Solar planning in Cornwall →
- Solar planning in Somerset →
- Solar planning in Dorset →
- Solar planning in Wiltshire →
- Solar planning in Gloucestershire →
- Solar farm land in Lincolnshire →
- Grid consultancy →
- Guide: small ground-mount planning →
Sources: Lincolnshire Wolds National Landscape · Natural England: National Landscapes renaming · National Grid: Grimsby to Walpole · GOV.UK: Lincolnshire local government reorganisation · NGED: queue formation · Solar Power Portal: 100MW threshold. Checked 2 November 2026.